Tata Steel Long Products Ltd. Jamshedpur
- Reverse Engineering of Steam & BFP Piping
- Interconnection of Steam line of 30MW STG- U2 CSDH To 25MW STG ( 700 Mts. Length)
- Interconnection of BFP Discharge line of 25MW STG To 30MW STG U2 ( 700 Mts. length)
- Design of Piping Rack for Steam & BFB Piping which is at an elevation of 10.5 Mts. for a length of 600Mts.
- Project Engg. Execution: April 2023 to March 2024